Section 1
Power Sector KPIs
Total Installed Capacity
32,800 MW
▲ +4.2% YoY
Renewable Energy Installed
25,269 MW
▲ +8.1% YoY
RE Share of Total Capacity
77.1%
▲ +3.2%
AT&C Losses (Distribution)
13.4%
▼ -0.8% (target 12%)
Daily Peak Demand Met
18,400 MW
✓ Met
Power Purchase Cost (avg)
₹5.62/unit
▲ +3.1%
Section 2
Renewable Energy Breakdown
| Source | Installed Capacity (MW) | Units Generated FY 2024-25 (MU) |
|---|---|---|
| Wind | 11,398 | 13,500 |
| Solar | 10,656 | 11,033 |
| Hydro | 2,324 | 4,800 |
| Biomass / Bagasse | 891 | 1,200 |
| Total RE | 25,269 | 30,533 |
| Thermal (Coal/Gas) | 7,531 | 68,400 |
TN ranked 4th nationally in solar capacity, 2nd in wind capacity added (FY 2024-25). RPO target 2024-25: 29.91% — actual RE procurement ~23.8% — shortfall penalty: ₹3.72/unit.
Section 3
TANGEDCO Restructuring (2024)
| Milestone | Status |
|---|---|
| Govt approval for restructuring | ✅ Completed — Jan 2024 |
| TNPGCL (Generation Co.) incorporated | ✅ Completed — Jul 2024 |
| TNPDCL (Distribution Co.) incorporated | ✅ Completed — Jul 2024 |
| TNGECL (Green Energy Co.) + TEDA merger | ✅ Completed — Jul 2024 |
| Staff allocation across 3 entities | 🟡 In Progress — 78% complete |
| Separate tariff filing for TNPDCL | 🟡 In Progress — TNERC review pending |
| TANGEDCO debt ring-fencing | 🔴 Pending — ₹1.5 lakh Cr total debt |
Section 4
Active Alerts
🟠HIGHAT&C Losses at 13.4% — Above Target
- Current: 13.4% (target: 12.0% by FY end)
- Revenue leakage estimated: ₹2,200 Cr/year at current loss level
- Worst districts: Vellore (18.2%), Tirunelveli (17.4%), Villupuram (16.8%)
- Smart meter rollout: 8.4 lakh of 2.4 Cr connections (3.5% penetration)
🟠HIGHRPO Compliance Risk — Penalty Exposure
- FY 2024-25 RPO target: 29.91% of consumption from renewables
- Actual achieved: ~23.8%
- Penalty rate: ₹3.72/unit for shortfall (~39,000 MU gap)
- Estimated penalty exposure: ₹1,450 Cr if not remediated
- Rooftop solar installations: 31,620 (vs. Kerala 1,06,925 — severely lagging)
Section 5
Rooftop Solar & Consumer Adoption
PM Surya Ghar — TN registrations3.2 L of 10 L target (2026)
Rooftop solar capacity (cumulative)1,840 MW
TNPDCL net metering active connections31,620 active
Avg. subsidy processing time67 days actual (target 30)
TNPDCL bottlenecks — slow processing, limited empanelled vendors, low feed-in tariff — cited as primary barriers to rooftop solar adoption.