Government of Tamil Nadu
Government of Tamil Nadu
Chief Minister's Operating System
Hon. Chief MinisterSearch... K
Hon. Chief Minister
Tamil Nadu
Back to Health Scorecard

Department

Energy Resources & Law

Combined portfolio · TNEB / Department of Law

Minister: C. T. R. Nirmal Kumar

64Watch
2 active
Data as of: 30 May 2026, 08:42 IST

TNEB Limited · TNPDCL · TNPGCL · TNGECL · TANGEDCO restructured into 3 entities in 2024; TEDA merged into TNGECL from July 2024.

Section 1

Power Sector KPIs

Total Installed Capacity
32,800 MW
▲ +4.2% YoY
Renewable Energy Installed
25,269 MW
▲ +8.1% YoY
RE Share of Total Capacity
77.1%
▲ +3.2%
AT&C Losses (Distribution)
13.4%
▼ -0.8% (target 12%)
Daily Peak Demand Met
18,400 MW
✓ Met
Power Purchase Cost (avg)
₹5.62/unit
▲ +3.1%

Section 2

Renewable Energy Breakdown

SourceInstalled Capacity (MW)Units Generated FY 2024-25 (MU)
Wind11,39813,500
Solar10,65611,033
Hydro2,3244,800
Biomass / Bagasse8911,200
Total RE25,26930,533
Thermal (Coal/Gas)7,53168,400

TN ranked 4th nationally in solar capacity, 2nd in wind capacity added (FY 2024-25). RPO target 2024-25: 29.91% — actual RE procurement ~23.8% — shortfall penalty: ₹3.72/unit.

Section 3

TANGEDCO Restructuring (2024)

MilestoneStatus
Govt approval for restructuring✅ Completed — Jan 2024
TNPGCL (Generation Co.) incorporated✅ Completed — Jul 2024
TNPDCL (Distribution Co.) incorporated✅ Completed — Jul 2024
TNGECL (Green Energy Co.) + TEDA merger✅ Completed — Jul 2024
Staff allocation across 3 entities🟡 In Progress — 78% complete
Separate tariff filing for TNPDCL🟡 In Progress — TNERC review pending
TANGEDCO debt ring-fencing🔴 Pending — ₹1.5 lakh Cr total debt

Section 4

Active Alerts

🟠HIGHAT&C Losses at 13.4% — Above Target
  • Current: 13.4% (target: 12.0% by FY end)
  • Revenue leakage estimated: ₹2,200 Cr/year at current loss level
  • Worst districts: Vellore (18.2%), Tirunelveli (17.4%), Villupuram (16.8%)
  • Smart meter rollout: 8.4 lakh of 2.4 Cr connections (3.5% penetration)
🟠HIGHRPO Compliance Risk — Penalty Exposure
  • FY 2024-25 RPO target: 29.91% of consumption from renewables
  • Actual achieved: ~23.8%
  • Penalty rate: ₹3.72/unit for shortfall (~39,000 MU gap)
  • Estimated penalty exposure: ₹1,450 Cr if not remediated
  • Rooftop solar installations: 31,620 (vs. Kerala 1,06,925 — severely lagging)

Section 5

Rooftop Solar & Consumer Adoption

PM Surya Ghar — TN registrations3.2 L of 10 L target (2026)
Rooftop solar capacity (cumulative)1,840 MW
TNPDCL net metering active connections31,620 active
Avg. subsidy processing time67 days actual (target 30)

TNPDCL bottlenecks — slow processing, limited empanelled vendors, low feed-in tariff — cited as primary barriers to rooftop solar adoption.

Section 6

Power Generation Mix Trend (12 months, MU)